Sadaf Interiors
Living room with a tan velvet sofa, dark curtains open onto a balcony, and a wall-mounted TV unit in oak

We hand back the keys on the date we agree.

Villas and apartments across Dubai, fitted out while your family is away. In-house team since 2015.

Book a free site visit

Your family travels in June. Your home is ready on the day we wrote into the contract.

  • Dubai, since 2015
  • One in-house team: design, site and handover
  • We handle the building and community NOC, so you do not have to

Recent work

Photographs on this page are reference images from Wikimedia Commons, not Sadaf Interiors' own work. Sources are in the footer.

Dubai Marina, 2-bedroom apartment

Dining area with a wood-effect table set for four, teal velvet chairs and a slatted oak wall

Full renovation · 1,300 sq ft · 8 weeks · AED 205,000

JVC, kitchen

Kitchen with a live-edge oak worktop, steel sink, white tiled wall and open oak shelves

Kitchen · 3 weeks · AED 48,000

Arabian Ranches, villa

Open kitchen with a dark timber cabinet, slatted timber wall panel and a marble-look worktop with induction hob

Majlis and kitchen · 6 weeks · AED 210,000

Al Barsha, two bathrooms

Bathroom mid-renovation: old blue panelling opened up at the base of the bath, bare tiled floor and a wooden step

Two bathrooms · 3 weeks · AED 62,000

Jumeirah, villa

Living room with a full-height sliding glass door onto a lake and a polished stone floor

Full renovation · 5,200 sq ft · 14 weeks · AED 720,000

Business Bay, studio

Bright living room with a blue sofa, herringbone oak floor and a white floating media unit

Studio · 4 weeks · AED 75,000

How the job runs

Kitchen cabinets and drawers pulled out of their units and stacked outside, the strip-out stage of a renovation

The site visit

Free, about an hour. We measure, photograph the home and agree the handover date on the spot.

Approvals

We prepare drawings and file for the building or community NOC. Work starts once it is issued.

The fit-out

A written update every week with photographs. Materials are ordered to the schedule we agreed together.

Handover

We walk the home with you and hand over the keys on the agreed date, then return in the first month for snags.

Prices

Estimate your range

Without a script, use the price list above, or message us on WhatsApp for a figure.

Questions

  • Free site visit, about an hour
  • Sat to Thu, 9:00 to 18:00
  • Office 000, Building name, Dubai
Do you handle the building and community approvals?

Yes. We prepare the drawings, file for the NOC with the building management or the community developer, and follow it through. Work on the approved scope starts only when the NOC is issued.

How long does a renovation take?

A kitchen takes 3 to 5 weeks, a bathroom 2 to 3 weeks, a full apartment from 8 weeks and a villa from 14 weeks. Approvals run in parallel where we can, and the agreed timeline includes them.

Can you renovate while we are abroad?

Yes, and summer is our busiest season for it. We agree the handover date in writing before work starts. You get a written update every week with photographs, and access is arranged in advance through one key holder.

How does payment work?

30% when the contract is signed, 40% when the first fix is complete, 25% at handover and 5% after the snag list is cleared. Each payment is tied to work you can see.

What warranty do you give?

One year on our workmanship from the handover date. Appliances and materials keep their manufacturers' warranties, and we hand over the papers at handover.

Where do the materials come from?

From licensed UAE suppliers and approved imports. You choose from a shortlist, and we bring samples to the site visit so you can see them in your own light.

Tell us the property and the date you need the keys back. We reply within one working day.

Book a free site visit

Your email app opens with these details filled in. Nothing is sent from this page.